Chapter 6 Multiple Choice Questions

Quiz Content

not completed
1) The percentage of global electricity production due to hydropower in 2018 was…

not completed
2) The power per metre width in a typical ocean wave is about…

not completed
3) Which one of the following statements is correct about a Fourneyron turbine?

not completed
4) The country with the largest hydropower capacity in 2019 was…

not completed
5) The power output of a dam is given by…

not completed
6) The maximum power output of a Pelton wheel is given by…

not completed
7) The maximum efficiency of a reaction turbine is given by…

not completed
8) Euler's equation provides a formula for the power output from a turbine. Does the fact that the derivation takes no account of the details of the flow inside the turbine (where the blades do work on the fluid) invalidate the formula?

not completed
9) Which of the following statements are true?
Please select all that apply.

not completed
10) The typical capacity factor of a dam is of order…

not completed
11) The interval between high tides is about…

not completed
12) The velocity of a tidal wave of wavelength λ in a sea of depth h is given by…

not completed
13) The country with the largest tidal potential in Europe is…

not completed
14) The velocity of a surface wave on deep water is given by…

not completed
15) The total energy per unit width per unit length of a surface wave on deep water is given by…

not completed
16) Which of the following statements are true?
Please select all that apply.

not completed
17) Which of the following statements are true?
Please select all that apply.

not completed
18) The maximum power output of a dam with a head of 100 m and a volume flow rate of 1 m3s-1 is about…

not completed
19) Which of the following statements are true?
Please select all that apply.

not completed
20) The accessible potential of hydropower by 2050 is about…